Second floor east wall, the wall is wet and there is standing water on the floor, 4/17

journal > 2019 > April - Andrew visits > Second floor east wall, the wall is wet and there is standing water on the floor, 4/17

April - Andrew visits DSC_1675

Second floor east wall, the wall is wet and there is standing water on the floor, 4/17

Keywords: home
Camera/lens: NIKON D7000, 17-50mm f/2.8
Aperture: 4.5, Shutter speed: 1/80, Focal length: 24.0 mm, ISO: 200, Bias: 0
Date/Time: 2019:04:17 07:56:39
Average color: gray57